For the new gas pipeline Val de Saône between Reims and Dijon, the earthworks for lot 3 were fully entrusted to De Romein Group as a partner of the main contractor. This 30 km long pipeline enhances the GRTgaz network to ensure gas delivery in the southern part of France.
About the Val de Saône Gas Pipeline
The project stretches over 188 km, connecting the Voisines and Etrez junctions.
The work is divided into 5 lots, and we have specifically taken responsibility for lot 3, which runs between Aubigny and Plaine and includes the Palleau station.

The project, spanning a length of 188 km, connects the junctions of Voisines and Etrez. The work is divided into 5 lots, and we are primarily responsible for lot 3, which runs between Aubigny and Plaine and the Palleau station.
Execution of the Work
We handled the complete preparation of the route, including the construction of bridges and access roads, as well as the removal of topsoil. Furthermore, we carried out the excavation and backfilling of the trench, the repair of roads, and the full restoration of the route along with the surrounding area to its original condition.
Additionally, we installed and subsequently removed a total of 30,000 meters of trench panels to minimize soil impact during the pipeline installation.
Why Did the Client Choose De Romein?
The main contractor awarded us the work as a strategic partner owing to our excellent collaboration on the Dorsales and Artère du Santerre projects. In addition to a favorable price-quality ratio and our specialist experience, knowledge, and expertise, it was also crucial for the client that we are a flexible organization with short lines of communication. We say what we do and we do what we say.